Warranty and General Conditions

Our commitments, clearly stated.

Certifié

RBQ License: 5880-2968-01.

Certified

APCHQ certified member.

Compliant

Installations that meet GCR and building code standards.

Insured

$2 million in liability insurance.

Limited warranty: labor and materials

T3M Concept extérieur guarantees the quality of its workmanship for a period of 5 years from the completion date of the work.

Warranties on installed materials and products are those provided by the respective manufacturers. T3M Concept extérieur rigorously follows their installation methods and recommendations, complies with applicable GCR and building code standards, and holds the required certifications. $2 million in liability insurance covers any damage that may occur during the work.

What the warranty covers

  • installation defects related to workmanship.
  • adjustments required due to improper installation.
  • issues directly related to work performed by our team.

 

What the warranty does not cover

  • normal wear and tear of materials.
  • ground movement, freeze-thaw cycles or settling.
  • damage caused by third parties, weather, overloading or misuse.
  • materials supplied by the client.
  • natural variations in wood (cracking, warping, shrinkage, discoloration, etc.).
  • damage related to foundations, existing structures or work not performed by T3M Concept extérieur.

 

Any modification or repair carried out by another company or by the client without authorization may void the warranty. The client must notify T3M Concept extérieur within a reasonable time of discovering a problem so that an inspection can be carried out. T3M is committed to assessing every situation fairly and professionally.

This warranty is valid only once full payment for the work has been made in accordance with the terms of the contract.

Download the Warranty (PDF)

General Terms and Conditions

General

  • unless otherwise stated in the quote or contract, it is the client’s responsibility to obtain the necessary permits, authorizations or approvals before work begins.
  • the terms of the work and required preparations are defined during the first project meeting.
  • all tools, equipment and machinery required for the work are included.
  • for the work to proceed safely and smoothly, workers must be able to carry out their tasks without interruption during working hours.
  • we take the necessary precautions to limit the impact on existing landscaping; however, we cannot be held responsible for any resulting damage.
  • a final walkthrough may be conducted with the client at the end of the work. Any visible issue must be reported within 48 hours; after that period, the work is considered compliant and accepted.
  • a surface water cleanup is performed at the end of the work if a water source is accessible; it is intended solely to remove debris related to the installation.
  • when possible, it is recommended to move vehicles away from the driveway to prevent damage during the work.
  • if materials are delivered on-site, the client is the primary contact for receiving them; materials delivered or left on-site remain the client’s responsibility.
  • timelines may change due to weather, supply delays or any situation beyond T3M’s control.
  • any change to the quote or the work after the contract is accepted may result in additional fees and adjusted timelines.
  • materials remain the property of T3M Concept extérieur until the invoice is paid in full.
  • unless the client provides written notice otherwise, T3M reserves the right to photograph completed work for promotional purposes.
  • the client must remove or protect furniture, decorations, plants and accessories in the work area, and clear away debris and unrelated items before our team arrives.

Pool Safety

  • our installations comply with the Residential Pool Safety Regulation in effect at the time of the work.
  • we cannot be held responsible for future regulatory changes or additional requirements that may apply to the project.

Piles and Foundations

  • the cost of pile installation may vary depending on soil conditions; additional fees may apply if extra work is required.
  • if concrete piers are required, the excavated soil may be left on-site at a location chosen by the client, or removed for a fee.
  • the client is responsible for locating underground utilities before work begins; T3M cannot be held responsible for damage caused by unlocated utilities.
  • for a concrete slab, color variations may appear during curing; this is normal and does not constitute a defect.

Fencing

  • it is the client’s responsibility to ensure the location of the future fence is properly marked out (site plan, confirmation from the city, or agreement with neighbours).
  • the client must submit a request to Info-Excavation before work begins.
  • T3M cannot be held responsible for an error in fence placement resulting from a lack of proper marking or prior confirmation of property boundaries.